New siding transforms your home, but the installation process can seem mysterious if you haven't been through it before. Here's exactly what to expect.
Before Installation Begins
Pre-Project Meeting
Your project manager will walk through the scope, timeline, material delivery schedule, and any special considerations. This is your chance to ask final questions.
Material Delivery
Siding, trim, house wrap, and accessories arrive 1–3 days before work begins. We'll place materials in a convenient but unobtrusive location.
Day 1–2: Preparation and Removal
Old siding is carefully removed and sorted for disposalUnderlying sheathing is inspected for rot, mold, or damageDamaged sheathing is replaced as neededWindow and door flashing is inspected and updatedDay 2–3: House Wrap and Prep
Weather-resistant barrier (house wrap) is installed over the entire homeAll seams are taped for maximum air and water resistanceWindow and door openings are properly flashed and sealedStarter strips and trim pieces are installedDay 3–5+: Siding Installation
Siding panels are installed bottom to top, one wall at a timeEach panel is leveled, locked, and fastened per manufacturer specsCorners, J-channels, and utility trim are fitted preciselySpecial attention is paid to window and door surroundsFinal Day: Trim, Cleanup, and Walkthrough
Final trim pieces and soffit/fascia are completedAll job-site debris is removedA magnetic sweep catches any stray nails or fastenersFinal walkthrough with you to confirm everything meets expectationsTimeline by Home Size
Small home (up to 1,500 sq ft): 3–5 daysMedium home (1,500–2,500 sq ft): 5–8 daysLarge home (2,500+ sq ft): 8–12 daysWeather delays, extensive repairs, and complex architectural details can extend these timelines.